Account
-
Safe payment options
We only work with the most secure payment systems.
-
Product return within 30 days
We do our very best to keep our customers happy.
No products in the cart.
You dont have any products in your cart yet, add a few products to experience this experience.
Add $500.00 to cart and get free shipping!
To see and take advantage of all discounted products.
Click HereModular Cleanroom Cost: Per Sq Ft Estimates, Cost Breakdown & ROI
Table of Contents
ToggleUnderstanding Modular Cleanroom Costs
Modular cleanroom costs typically range from $150 to $450 per square foot for basic to high-spec installations, with complete projects costing between $25,000 for small labs to over $1 million for large, advanced facilities.
This comprehensive guide will help you accurately estimate your modular cleanroom cost per square foot, understand the complete cost breakdown, compare options, and identify significant savings opportunities for your project budget.
Whether you’re planning a pharmaceutical lab, electronics manufacturing space, or biomedical research facility, this article provides the detailed cost analysis you need for informed decision-making about your cleanroom investment.

Modular cleanroom cost
Quick Cost Overview
| Cleanroom Type | Cost per sq ft | Cost per m² | 10 m² Project | 50 m² Project | 200 m² Project |
|---|---|---|---|---|---|
| Basic (ISO 7-8) | $150 – $250 | $1,615 – $2,690 | $16,000 – $27,000 | $80,000 – $135,000 | $320,000 – $540,000 |
| Mid-Range (ISO 5-6) | $250 – $350 | $2,690 – $3,765 | $27,000 – $38,000 | $135,000 – $190,000 | $540,000 – $760,000 |
| High-End (ISO 3-4) | $350 – $450+ | $3,765 – $4,840+ | $38,000 – $49,000+ | $190,000 – $245,000+ | $760,000 – $980,000+ |
Modular Cleanroom Cost Ranges per Square Foot
Basic
Mid-Range
High-End
Typical cost ranges for prefabricated cleanrooms based on ISO classification and specifications
Modular Cleanroom Cost Breakdown
Cost Distribution Analysis
Detailed Cost Components
A. Structure & Envelope
Panels, doors, windows: $40-80/sq ft
Materials: EPS, PU, rock wool panels. Key factors: panel thickness, fire rating, custom sizes, window/door specifications, and cleanroom panel quality.
B. HVAC & Air Handling Equipment
FFU, AHU, filters: $50-120/sq ft
Fan Filter Units, Air Handling Units, HEPA/ULPA filters. Higher air change rates and stricter ISO class requirements significantly increase HVAC costs and total cost of ownership.
C. Flooring & Lighting
$15-35/sq ft
Epoxy flooring, ESD vinyl, conductive flooring options. LED cleanroom fixtures with sealed housings to prevent particle generation and ensure proper illumination.
D. Electrical & Control Systems
$20-45/sq ft
Power distribution, sensors, control panels, monitoring systems, data logging, and environmental controls for precise cleanroom management.
E. Installation & Construction
$15-30/sq ft
Labor costs, site preparation, transportation, assembly. Faster installation typically reduces overall project costs and minimizes business disruption.
F. Certification & Testing
$5-15/sq ft
Cleanliness testing, particle counts, airflow visualization, pressure differentials, and third-party certification fees to ensure regulatory compliance.
G. Maintenance & Operation (TCO)
$10-25/sq ft annually
Filter replacements, energy consumption, maintenance contracts, repairs, and ongoing operational expenses that contribute to total cost of ownership.
Key Factors Affecting Modular Cleanroom Cost
Area & Ceiling Height
Larger areas reduce cost per square foot due to economies of scale. Higher ceilings significantly increase HVAC and structural costs – each additional foot can add 5-10% to total project cost.
Cleanliness Class (ISO 1-9)
ISO 7-8: $150-250/sq ft | ISO 5-6: $250-350/sq ft | ISO 3-4: $350-450+/sq ft. Higher classes require more advanced filtration, greater air changes, and sophisticated monitoring systems.
Customization Level
Standard modular designs cost 15-30% less than fully customized solutions. Custom sizes, special materials, unique layouts, and proprietary components significantly increase costs.
Geographic Location
Labor costs vary by region – urban areas typically have 15-25% higher installation costs. Shipping distances affect transportation expenses, especially for prefabricated components.
Construction Timeline
Faster deployment may incur premium costs (10-20% rush charges). Extended timelines increase labor expenses. Prefabricated modules can reduce on-site construction time by 40-60%.
Module Type & Specifications
Softwall: $100-200/sq ft | Hardwall: $150-300/sq ft | Rigid wall systems: $200-450/sq ft. Each offers different durability, performance, and long-term value for your investment.
Modular vs Traditional Cleanroom Cost Comparison
| Factor | Modular Cleanroom | Traditional Cleanroom |
|---|---|---|
| Initial Cost | $150-450/sq ft | $200-600/sq ft |
| Construction Time | 2-8 weeks | 3-12 months |
| Flexibility & Expansion | High (easily expanded or reconfigured) | Low (permanent structure, difficult to modify) |
| Relocation Potential | High (80-90% reusable) | Low (mostly demolition, 10-20% salvageable) |
| Long-term Operating Cost | Lower (better energy efficiency, modern systems) | Higher (less efficient systems, higher maintenance) |
| Ideal Use Cases | R&D, growing businesses, temporary needs, budget-conscious projects | Large-scale permanent production, legacy facilities, highly specialized applications |
Cost Estimation Tool & Calculator
Calculate Your Project Cost
Estimated Cost
This is a preliminary estimate. Contact us for a detailed quote with exact specifications.
Download Resources
Get our detailed cost calculation spreadsheet and specification checklist for accurate budgeting and planning:
Calculation Methodology
Our estimates are based on current market rates for materials and labor, excluding taxes and site-specific preparation costs.
Assumptions: Standard panel systems, basic utility connections, typical site conditions. Actual quotes may vary based on project specifics and geographic location.
Cost Saving Strategies for Modular Cleanrooms
Standardized Modules
Using standard panel sizes and configurations can reduce costs by 15-25% compared to fully custom designs while maintaining performance and compliance with industry standards.
Prefabricated Components
Factory-built components reduce on-site labor and construction time, lowering overall project costs by 10-20% while improving quality control and consistency.
Phased Implementation
Deploy your modular cleanroom in phases to spread costs over time and align with business growth rather than over-investing upfront in unused capacity.
Right-Sized Cleanliness Class
Choose the appropriate ISO class for your actual needs. Over-specifying can increase costs by 30-50% without providing tangible operational benefits.
Energy-Efficient HVAC
Invest in modern, energy-efficient HVAC systems that may cost 10-15% more upfront but reduce long-term operating expenses by 20-40% through lower energy consumption.
Maintenance Contracts
Negotiate comprehensive maintenance contracts that include filter replacements and system checks to avoid unexpected repair costs and extend equipment lifespan.
Case Studies & Testimonials
Pharmaceutical Research Lab
“Saved 25% compared to traditional construction while meeting all regulatory requirements and achieving certification ahead of schedule.”
Project Size: 800 sq ft ISO 6 cleanroom
Budget: $280,000 | Actual Cost: $210,000
Savings Achieved: Standardized modules and efficient HVAC selection
Timeline: 5 weeks from order to certification
Electronics Manufacturing Facility
“The modular approach allowed us to expand our facility as production increased, avoiding costly downtime and reconstruction.”
Project Size: 1,500 sq ft ISO 7 cleanroom
Budget: $375,000 | Actual Cost: $320,000
Savings Achieved: Phased implementation and right-sized cleanliness class
Timeline: Initial phase: 6 weeks, Expansion: 3 weeks
Medical Device Startup
“We achieved regulatory compliance with a limited budget thanks to the cost-effective modular solution and expert guidance on specifications.”
Project Size: 400 sq ft ISO 8 cleanroom
Budget: $80,000 | Actual Cost: $72,000
Savings Achieved: Prefabricated components and strategic equipment selection
Timeline: 3 weeks from planning to operation
Frequently Asked Questions
What is the average cost per square foot for a modular cleanroom?
Modular cleanroom costs range from $150 to $450 per square foot, depending on the ISO classification, customization level, and included systems. Basic ISO 7-8 cleanrooms start around $150/sq ft, while high-spec ISO 3-4 facilities can exceed $450/sq ft. The final cost per square foot depends on specific requirements and project scope.
How long does a modular cleanroom typically last?
With proper maintenance, modular cleanrooms can last 15-25 years. The panel systems are durable, and components like filters and lighting can be replaced as needed. Many facilities successfully operate modular cleanrooms for decades with appropriate upkeep, regular filter changes, and periodic system updates.
Is equipment installation included in the cleanroom cost?
Process equipment installation is typically not included in base cleanroom costs. The quoted price generally covers the cleanroom structure, HVAC, electrical, and control systems. Equipment installation, such as for manufacturing or laboratory apparatus, is usually priced separately based on specific requirements and complexity.
How much does installation add to the total cost?
Installation typically adds $15-30 per square foot to the total project cost. This includes site preparation, assembly labor, utility connections, and basic commissioning. Complex sites, tight timelines, or challenging access conditions may increase installation expenses beyond this range.
What is the HVAC cost for a modular cleanroom?
HVAC systems represent 30-40% of total cleanroom costs, typically $50-120 per square foot. Higher cleanliness classes require more sophisticated air handling with greater air changes, increasing HVAC expenses significantly. Energy-efficient systems may cost more upfront but provide substantial long-term savings.
Can modular cleanrooms be relocated?
Yes, one of the key advantages of modular cleanrooms is their relocatability. Typically, 80-90% of components can be disassembled and reinstalled at a new location, though some elements may need replacement and recertification is always required. This makes modular cleanrooms ideal for growing businesses or temporary facilities.





